BA3005: A Carpet Shop Specialises in Selling six types of Fine Carpets Named Simply as Iranian Algerian Turkish Peruvian Uzbek and Malian: Managing Data and Information Assignment LMU, UK

University London Metropolitan University (LMU)
Subject Managing Data and Information Assignment

Task A
A carpet shop specialises in selling six types of fine carpets named simply as “Iranian”, “Algerian”, “Turkish”, “Peruvian”, “Uzbek” and “Malian”.
The shop wants you to create an Excel sales table consisting of the following entries:

Type of carpet N° of units sold Price (£) Total (£)
       

They want to data-validate as a list of the cell presented in green above.
The number of carpets (N° of units) to be sold should be data-validated as a number that does not exceed TWO. The price (£) should be retrieved from the following table using an XLOOKUP formula.

Type of carpet Price (£)
Iranian 12000
Algerian 10000
Turkish 8000
Peruvian 15000
Uzbek 20000
Malian 14000

The Total (£) column should be calculated using the following Excel formula:
Required:
Produce an Excel worksheet showing how you will progress the above project. You need to show useful screenshots and formulae for all the activities and give how your table retrieves the price for the “Peruvian” carpet. You should insert all your work on a single WORD page.

Do You Need Assignment of This Question

Task B
An airline company surveyed its passengers regarding their experience through the airport. In particular, they wanted to examine the level of their satisfaction and the time taken to get through the airport.
The satisfaction level is measured using scores from 0=Not at all satisfied to 60=Very satisfied.
The time through the airport was measured by giving each passenger a card once they arrive at the airport to be returned to an agent once they reach the departure lounge and the time measured in minutes.
The following questionnaire was used. The data is recorded in the filename “Airport.xlsx”.

The questionnaire

About you and your travel            
Q.1: Is your [Age]:  1. <20 2. 20 to 29 3. 30 to 39 4. 40 to 49 5. 50 and over
Q.2: Are you travelling today [Type]? 1. Business 2. Holiday 3. Family visit
Q.3: Are you travelling [Class]? 1. Business (First) class   2. Economy

Q.4: How many pieces of [luggage] are you travelling with? Please state:

Required

  1. Produce frequency and percentage frequency tables for each of the following variables:
  • Age
  • Type (of travel)
  1. Draw a bar chart representing the variable “Age”.
  2. Calculate the descriptive statistics (Location and spread) for the variable “Satisfaction”.

The descriptive should include the minimum, maximum, both quartiles, mean, median, variance, standard deviation, range and inter-quartile range.

Please note that the statistics should be presented correct to a whole number but the mean and standard deviation should be presented correctly to the nearest 1 decimal place.

  1. Draw a box plot for the variable “Satisfaction” split by “Class” of travel.
  2. Draw a scatter diagram of the “satisfaction” score against “time” taken, calculate the correlation coefficient and show the linear regression equation in context (not in x and y).

Buy Answer of This Assessment & Raise Your Grades


Task C
A builder contacted you for project management work in order to plan a medium scale building project. He knew all the different activities of the job, their precedence and their average durations which he shared with you. They are shown in the table below.

  Activity       Duration (Weeks)     Preceding activities  
  A       1     None  
  B       2     None  
  C       3     A and B  
  D       4     C  
  E       2     A  
  F       4     E  
  G       3     D  
  H       2     F  
  I       2     H  

Required:

  1. Draw a network diagram and conduct the forward and backward pass.
  2. State the duration of this project and the critical path.
  3. Explain, without doing any calculation, what would happen to the project if the actual duration of activity A is two weeks. No more than 20 words.

Note:
The work for this task should be produced using Word drawing facilities. The forward and backward passes should be clearly shown on the diagram. Each activity should be described using the notation shown in class as follows:

Activity name Earliest start time Earliest finish time
Activity duration Latest start time Latest finish time

Task D
A small hotel with 8 rooms is located in central London. Based on records over the last 5 years, it was estimated that the probability a room is occupied on any particular “weekend” night (Saturday and Sunday) is 0.7. This is the probability of success.
On any particular “weekend” night, a hotel is only occupied (Success) or not occupied (Failure).
There are no other possibilities.

  1. What is the probability that FOUR or more rooms are occupied on any particular weekend night? Show all your calculations using a well laid-out Excel spreadsheet table.

The occupancy rate on any particular night during a weekday (Monday to Friday) is assumed to be 50%, i.e. a room has a probability of 0.5 to be occupied during any week-day.
On the first Monday on January, 2 out of the 8 rooms were occupied.

  1. What is the p-value? You need to show the table of values for your calculations

Give your answers correct to 3 decimal places.

Are You Looking for Answer of This Assignment or Essay

UK students seeking the best assignment help in Managing Data and Information can now rely on our expert services. Whether it’s BA3005 or any other course, we offer specialized Management Assignment Help UK tailored to your academic needs. Our team of professionals ensures that you excel in assignments, including complex topics like “A Carpet Shop Specializes in Selling six types of Fine Carpets Named Simply as Iranian, Algerian, Turkish, Peruvian, Uzbek, and Malian.” Trust us with your coursework, and we’ll guide you toward academic success at LMU, UK.

Answer

Do You Need Assignment of This Question