- Assessment: Financial Performance Evaluation of Savory Snacks Company Ltd for Credit
- CMI L5 Assignment: Managing Stakeholder Relationships: Strategies, Challenges, and Best Practices
- Level 3 Unit 2 Assignment: Principles, Values and Regulation in the Health and Social Care Sector
- COM4006 Assignment: Introduction to Academic Skills and Professional Development
- Assessment: Managing Organisational Change: Evaluating Strategies, Challenges, and Impact
- UNIT CMI 706 Assignment: Finance for Strategic Leaders: The Role, Scope, and Impact of Finance
- ENGINEERING DESIGN TMA2 v1: CAD Design Report: Specification, Evaluation & Drawings
- Unit CMI 514 Assignment: Analysis of Organisational Change: Managing Change
- EMS402U TMA1: Engineering Design Solutions: Concept Development & Assessment
- LEVEL 3 UNIT 31: Effective Project Management (International BTEC )
- ILM Level 4 ASSIGNMENT: Managing equality and diversity in own area
- CMI 504 Assessment: The Rationale For Managing Performance Within Organisations
- Level 7 Unit 03 Assignment: Leading a Strategic Management and Leadership
- LO:01, LO:02 (MSCCO01) Managing Innovation and Change in Computing
- CMI Level 6 Certificate in Professional Management and Leadership
- Financial Accounting: Double-Entry Bookkeeping, Journals, Ledgers, and Trial Balance Preparation
- Assignment 1: Understand and Work with a Wide Range of Stakeholders and Organisational Structures
- CMI 526 Assessment: Principles of Leadership Practice
- Promoting Health, Wellbeing, and Inclusive Care in Health and Social Care Settings
- MID4022 Legal and Ethical Professional Principle in Midwifery
ELEC3213: An 8 MW and 5 MVAR three phase balanced load is connected to a three phase source with a voltage of 13.8 kV through a transmission line: Power Systems Engineering Assignment, UOS, UK
University | University of Southampton (UOS) |
Subject | ELEC3213: Power Systems Engineering |
An 8 MW and 5 MVAR three phase balanced load is connected to a three phase source with a voltage of 13.8 kV through a transmission line. The line is 20 miles in length and has a series impedance of 0.025 + j0.05 0 per mile and it is rated at 25 MVA.
a) Use PowerWorld to find the line current, load voltage and the losses in the transmission line.
b) Comment on the system and check if anything needs adjustment or if you would suggest any change; justify your response.
c) After 5 years, the load is expected to grow by 50 % (with the same power factor). Use PowerWorld to estimate the line current, load voltage and line losses at this time. Also using the simulator, find the voltage profile along the line; i.e. plot the line voltage versus the length of the line.
d) Based on these results, comment on whether the network will need improvement or it could continue without any adjustment.
e) A capacitor bank is planned to be installed after 5 years to correct the power factor of the load to 0.99. Estimate and comment on the effect of this on:
• The line current,
• The line voltage profile and compare it with the line voltage profile obtained in task (c),
• The line losses and
• The load voltage. Activate WI
f) Estimate the financial saving on losses the connection of the capacitor bank will to Settings • bring (assume £0.16 per kWh) each year. Comment on the economic feasibility of this step.
Buy Answer of This Assessment & Raise Your Grades
Struggling with your ELEC3213: Power Systems Engineering Assignment at the University of Southampton (UOS), UK? Don’t worry; we’ve got you covered! Our Engineering Assignment Help service offers the perfect solution for your academic challenges. Whether it’s comprehending the complexities of an 8 MW and 5 MVAR three-phase balanced load connected to a 13.8 kV three-phase source through a transmission line or any other power systems engineering topic, our expert team is here to assist you. Simply pay our knowledgeable professionals and witness your course worries fade away. Embrace confidence in your studies with our top-notch support. Let’s excel together!